Decks
A deck is footings, framing and railings first, and boards second. Here's what goes into building one, and what to decide before it's built.
Wood or composite
- Pressure-treated wood is the usual choice and the lower-cost one. It needs sealing or staining from time to time, and the gaps between boards open and change as the wood dries — that's the nature of wood, not a fault.
- Composite and PVC boards cost more up front and need less upkeep. They're installed to the manufacturer's instructions and carry the manufacturer's own warranty. They can get hot in direct sun, they can scratch, and the color can vary a little from one batch to the next.
Permits and inspections
Most cities require a permit for a new deck. Where yours does, we get it and arrange the inspections — and the deck isn't finished until it has passed the final one.
Before we dig
Deck footings are dug, so the same rules as a fence apply: we request 811 utility marking first, and you show us where the property line is and where any private lines run — sprinklers, lighting, a line out to a shed or a hot tub.
Where it meets the house
Most decks attach to the house, and some things can't be seen until work starts — rot in the house's framing where the deck attaches, missing flashing, or rock where a footing needs to go. If they turn up, they're priced separately. Planning a hot tub? Say so up front: a deck has to be designed for that weight.
What it costs
It depends on the size of the deck, how high it sits off the ground, the material, the stairs and railings, and how simple or detailed the shape is. Taking out an old deck is a separate item. You'll have a free written estimate before any work starts.